EV charging
Engineering design for EV charging infrastructure — single chargers through to multi-megawatt depots. UK and US markets, working to DNO / IDNO standards and US utility interconnection requirements.
How EV projects fit together
Most EV projects start with a site assessment — power capacity, site geometry, planning constraints, indicative cost. From there, load calculations size the electrical infrastructure to match the charger spec. Charging hub design turns the viable site into buildable construction documentation. Grid connection design handles the utility-side application where the load exceeds existing supply.
Where the build needs CAD-format drawings — typically for permit submissions or contractor handover — our CAD drafting service produces the DWG output. Construction packs and permit packs are listed under fibre but apply to EV projects identically.
Services we offer in EV
Talk to us about an EV project
Tell us the site, the charger spec, and the timeline. We'll come back with what we'd need to scope it properly and a price range.