Reference articles
Articles on fiber network design, make-ready disputes, EV and fiber site selection, and GIS data and operations, for ISPs, co-ops, utilities, and contractors.
Free tools
A PON power budget calculator checks a GPON or XGS-PON link budget, a fiber loss calculator checks link loss, and a make-ready timeline calculator tracks FCC pole attachment deadlines, with no signup and no data leaving the page.
PON power budget calculator
Check a GPON or XGS-PON link budget: connectors, splitters, fiber loss, remaining margin. Runs in the browser, no data leaves the page.
Fiber optic loss calculator
Estimate point-to-point fiber link loss at 1310/1550 nm single-mode or 850/1300 nm multimode, with headroom against a loss limit. Runs in the browser, no data leaves the page.
FCC make-ready timeline calculator
Check FCC make-ready deadlines under 47 CFR 1.1411: completeness, survey, estimate, and make-ready dates for standard or OTMR orders. Runs in the browser, no data leaves the page.
HLD and LLD deliverable checklist
A one-page checklist for sign-off at the HLD, fielding, and LLD gates of a fiber design, plus a scope-boundary section.
Specialist capacity
LayerSpec places partner firms and independent professionals from its network onto fiber, EV charging, and GIS projects, as a complete team or embedded in your own.